On a misty morning the lift commences.  The boiler, sat on the chaired sleeper wagon, was hauled out of the workshop.  THe Crane took the weight of the boiler annd lifted it off the wagon.  The 08 then hauled the wagon away and replaced it with 5637`s frame.
On a misty morning the lift commences. The boiler, sat on the chaired sleeper wagon, was hauled out of the workshop. THe Crane took the weight of the boiler annd lifted it off the wagon. The 08 then hauled the wagon away and replaced it with 5637`s frame.
Credit: Dick Bellchambers, 7 February 2005