The reserve ballast stock on the ?stone dock? after delivery the larger pile on the floor of the tanker sidings was used first before this stock as touched.
The reserve ballast stock on the ?stone dock? after delivery the larger pile on the floor of the tanker sidings was used first before this stock as touched.
Credit: Richard Watson, 16/01/2005