Following the arrival last month of the front tubeplate, work has begun on drilling the holes.  The tubeplate is seen on the workshop drill having the pilot holes drilled by Paul Ebsworth.
Following the arrival last month of the front tubeplate, work has begun on drilling the holes. The tubeplate is seen on the workshop drill having the pilot holes drilled by Paul Ebsworth.
Credit: Gavin Moore, 7 September 2005