This shot shows the placing of the hot rivet.  Rory is shown going into the boiler barell to place the rivet in the hole. This is done as quickly as possible so that the rivet is still white hot when Steve Masters begins forming the head from the outside of the barrel.
This shot shows the placing of the hot rivet. Rory is shown going into the boiler barell to place the rivet in the hole. This is done as quickly as possible so that the rivet is still white hot when Steve Masters begins forming the head from the outside of the barrel.
Credit: Barney Casey, 8 January 2006