To get as much shunting done as possible two engines were used.  30075 was steamed to assist PBA 39 in the multitude of tasks necessary around the site to get ready for the gala.  She is shown having come round for coal and to pick up some wagins `out the back`.
To get as much shunting done as possible two engines were used. 30075 was steamed to assist PBA 39 in the multitude of tasks necessary around the site to get ready for the gala. She is shown having come round for coal and to pick up some wagins `out the back`.
Credit: Gavin Moore, 31 March 2006