5637 in the running shed with all of the lagging removed from the boiler and some more of the 218 boiler tubes knocked out waiting to be carried away.
5637 in the running shed with all of the lagging removed from the boiler and some more of the 218 boiler tubes knocked out waiting to be carried away.
Credit: R.Bellchambers, 24/10/07