Two cranes were hired to lift the boiler out of the frames and to lift the frames off the wheels. Two cranes were used rather than just one as the boiler was needed to be rolled over and while one crane started to turn the boiler, the other supported it to ensure the whole operation was under full control.
Two cranes were hired to lift the boiler out of the frames and to lift the frames off the wheels. Two cranes were used rather than just one as the boiler was needed to be rolled over and while one crane started to turn the boiler, the other supported it to ensure the whole operation was under full control.
Credit: R.Masters, 19th December 2007