The weekend of 10/11th of January saw extensive lineside clearance to the south side of the main line, the first step in preparing a permanent track bed for the miniature railway.
The weekend of 10/11th of January saw extensive lineside clearance to the south side of the main line, the first step in preparing a permanent track bed for the miniature railway.
Credit: Andy Lunness, 11 January 2009