Having spent the last two days packing standard gauge track, the permanent way gang unload ash from a dogfish wagon ready to pack our 7.25" line.
Having spent the last two days packing standard gauge track, the permanent way gang unload ash from a dogfish wagon ready to pack our 7.25" line.
Credit: Andy Lunness, 11th April 2009