The water tank base panels have been lifted in to position on top of the steel frame and work has commenced on the inner blockwork wall.
The water tank base panels have been lifted in to position on top of the steel frame and work has commenced on the inner blockwork wall.
Credit: A.Milner, 27th March 2010