After inital stripping operations had been commpleted it was necessary to invert the boiler of Meteor to allow work to continue. In this picture, crane driver Roger is rigging the boiler ready for lifting.
After inital stripping operations had been commpleted it was necessary to invert the boiler of Meteor to allow work to continue. In this picture, crane driver Roger is rigging the boiler ready for lifting.
Credit: Alan Milner, 25/09/10