After the running rails have being removed, a pair of short rails are used to lift out 7 old wooden sleepers simultaneously. Terry guides the old sleepers to the far end of the worksite. The old sleepers will be collected later on in the week, when space becomes available on a flat wagon.
After the running rails have being removed, a pair of short rails are used to lift out 7 old wooden sleepers simultaneously. Terry guides the old sleepers to the far end of the worksite. The old sleepers will be collected later on in the week, when space becomes available on a flat wagon.
Credit: Phil Hamerton, 22/02/2016