Soon the sleepers are flying off the wagon. After enough sleepers are offloaded, they are lined up and a pair of rails reinstated, enabling the sleeper wagon to be pushed closer to remaining gap.
Soon the sleepers are flying off the wagon. After enough sleepers are offloaded, they are lined up and a pair of rails reinstated, enabling the sleeper wagon to be pushed closer to remaining gap.
Credit: Tom Dalton, 23/02/2016