After fitting the J pipe and hydraulic testing, we had a chain gang of 5 people feeding the tubes in and out of the boiler to cut each one to length before finally fitting back into the boiler ready for expanding.
After fitting the J pipe and hydraulic testing, we had a chain gang of 5 people feeding the tubes in and out of the boiler to cut each one to length before finally fitting back into the boiler ready for expanding.
Credit: S.Masters, 05/02/17