On a misty morning the lift commences.  The boiler, sat on the chaired sleeper wagon, was hauled out of the workshop.  THe Crane took the weight of the boiler annd lifted it off the wagon.  The 08 then hauled the wagon away and replaced it with 5637`s frame. The frames are in place and the boiler ready to be swung into position Getting Closer..... Nearly there! Touchdown! From a different angle. And now for the Side Tanks The Tanks are lifted from their storage location over the fence and back into position either side of the boiler. The tanks are lowered very gently into position Willing hands guide the tank into its position before starting on the driver`s side.